Saturday, April 30, 2016

Move out completed!

Well, we are utterly exhausted.

Today, we handed back the keys to our three bedroom home to the landlord. This past week and a bit has been filled with constant trips to the storage unit for the things we're holding onto, as well as trips to the dump for the two dozen bags of garbage that we had. When you're getting ready to move into an RV, it's amazing all the trinkets you decide are better off in the trash.

We dropped off a couple boxes of books at the local second hand shop as well as some other things. We even dropped a bunch of stuff on the lawn with a "Free" sign, and that cleared up a lot as well.

Friday, April 22, 2016

Personalizing Princess' Loft

Well, painting Miss princess' loft is complete, and today, she and my wife added in the personalization!

 
Princess was very excited to finally be able to add her stickers. She's been asking for two days, and very unrelenting in it as well.

Thursday, April 21, 2016

Floors and Trim Complete. More Painting.

We finally got the flooring completed, and bought some metal guards for the edges near the steps and front of the flooring where it was open and at risk of coming apart if we didn't add it in.


One more thing checked off the list!


Thursday, April 7, 2016

Trim has been installed!

It's taken some time, but children are a priority, and even more-so when they are sick. Yesterday, my wife stained our trim after I was able to get it all cut, and today I installed it.

 

Monday, April 4, 2016

Floor is installed, working on trim

It's been a tough go trying to get everything ready in the RV with a teething infant, and a sick toddler. We're ever so slowly making headway, and the results look amazing indeed!